Commercial Projects

Crescent Tower

Neom Hotels

ABHA Center Development Project

Movenpick Hotel

Modon Garden restaurant

KHOBER Corniche Multi-Use Development

Makkah Tawhid Intercontinental Hotel

Lexus Show Room Project

Sizzler House Restaurant

La Mirada Mall and Club House

El Safa Plaza

Sky Event

Half Moon 2006 Asian Games Statue

Iconic Tower

Jeddah Yacht Club

National Bank Of Egypt , NBE.

National Bank of Kuwait

QNB Islamic Bank Office Building

Jebal Omar Development Hotels, Phase 2

Commercial International Bank, CIB

New Giza Club

Marriot Cairo Hotel Project

Crescent Tower

 

Client: Orascom Construction Company , Egypt

Location: New Capital , Cairo , Egypt

Project Description and ACC Scope of Work:
The Crescent tower is located in the New Capital Business District (CBD) . The tower has two crescent shaped buildings facing each other. One Crescent Building is planned to be a hotel while the other would be hotel apartments. The project is facing the Iconic Tower (tallest tower in Africa) and would be the main hospitality element for the CBD project. ACC was assigned by Orascom Construction Company (Main Contractor) for the task of finalizing the structural shop drawings for the podium as well as some design technical support tasks.

Project Duration and Status : 2021 – In Progress

Neom Hotels

 

Client: Saudi Arabian Baytur Contracting Company, SAB, KSA

Location: Neom , Red Sea , Tabuk , KSA

Project Description and ACC Scope of Work:
Neom Area Developments is one of the main pillar of Saudi Arabia Vision 2030. The project is the first of many mega projects that will be constructed on the shores of the red sea. Neom Hotels masterplan included a 5 star hotel , a 4 star hotel , VIP villas and utility buildings . The project will cater around 600 rooms to visitors of the Neom Area Projects. ACC scope of work includes engineering design development , shop drawings and technical site support comprising project control, contracts and claims management, Quality assurance and control, quantity surveying and site inspection works.

Project Duration and Status : 2018-2020 Completed

ABHA Center Development Project

*In cooperation/association and name of Advanced Construction Center ACC Riyadh, Saudi Arabia

 

Client: Public Pension Agency, KSA

Location: ABHA, KSA

Project Description and ACC Scope of Work:
Abha Center proposed Master plan is introducing a multi-purpose functional project located in downtown Abha . The Masterplan plan includes a 13 floors hotel , 11 floors office tower , 9 floors residential building , commercial building, cultural facility, social facility and other mixed- use recreational buildings. ACC scope is proposing the project schematic design concept and development of the master plan.

Project Duration and Status : 2017 – 2018 Completed

Movenpick Hotel

 

Client: Egyptian General Company for Tourism & Hotels “E.G.O.T.H” , Egypt

Location: Aswan , Egypt

Project Description and ACC Scope of Work:
Movenpick is one of the land mark hotels in the city of Aswan, Egypt. The Hotel contains two wings , namely A and B with around 500 rooms ACC scope is to design and supervise the implementation of a fire strategy for the hotel buildings, identify the escape routes and introduce required modifications to qualify the hotel fire standard to local and international civil defense codes. The scope includes engineering design and supervision of all required modifications.

Project Duration and Status : 2019 Completed

Modon Garden restaurant

*In cooperation/association and name of Advanced Construction Center ACC Riyadh, Saudi Arabia

 

Client: Modon Restaurants , AlKherj , KSA

Location: Al Kharj Industrial City , KSA

Project Description and ACC Scope of Work:
Garden restaurant is a local franchise offering fast food in Saudi Arabia. The restaurant branch is located in Al Kharj industrial area and it will cater various types of foods for the customers working in the industrial city. ACC scope of work is engineering design , project management and site supervision.

Project Duration and Status : 2016 – 2017 Completed

KHOBER Corniche Multi-Use Development

*In cooperation/association and name of Advanced Construction Center ACC Riyadh, Saudi Arabia

 

Client: Public Pension Agency, KSA

Location: Khobar , KSA

Project Description and ACC Scope of Work: The project master plan includes low to high rise residential buildings, gated compounds, commercial/retail , office blocks , 5-stars hotel, MICE center and other recreational facilities. The proposed development plot area is around 1 Million square meters. ACC scope of work is master plan design, enabling works and infrastructure packages. ACC was the lead consultant for the project.

Project Duration and Status : 2013 – 2017 Completed

Makkah Tawhid Intercontinental Hotel

 

Client: Saudi Bin Ladin Group , KSA

Location: Makkah, KSA

Project Description and ACC Scope of Work:
Tawhid Intercontinental hotel is a mega hotel in Central Makkah area facing the holy mosque. The building was designed with innovative structural techniques to accommodate the rough terrain of the city of Makkah .ACC scope was to provide structural design and technical support to the main contractor during all construction phases.

Project Duration and Status : 1999 – 2002 Completed

Lexus Show Room Project

*In cooperation/association and name of Advanced Construction Center ACC Riyadh, Saudi Arabia

 

Client: Hala Auto, Riyadh , KSA

Location: Riyadh, Saudi Arabia

Project Description and ACC Scope of Work:
Lexus , the famous high-end Japanese cars producer, intended to build and operate a new facility in Riyadh city . ACC scope includes reviewing and validating the full project design, tender documents, bills of quantities and project specifications. The scope also included a full value engineering study and reporting.

Project Duration and Status : 2018 – 2019 Completed

Sizzler House Restaurant

*In cooperation/association and name of Advanced Construction Center ACC Riyadh, Saudi Arabia

 

Client: HB Brands . Riyadh , KSA

Location: Riyadh, KSA

Project Description and ACC Scope of Work:
Sizzler house is a famous American dining franchise. The developed state-of-art design of this Sizzler House Branch in Riyadh utilized the interior design to have an exterior environmental architectural feature. The design implemented the classical building architecture to create various spaces and facades and give the outdoor feeling to the customers. ACC scope is the engineering design for the restaurant interior works and supervision of all construction phases till handover and operation.

Project Duration and Status : 2018 – 2019 Completed

La Mirada Mall and Club House

 

Client: Grand Plaza Development Company , Egypt

Location: New Cairo, Egypt

Project Description and ACC Scope of Work:
LaMirada mall is located in the center of New Cairo within LaMirada compound development. The mall is to include various brands, restaurant and a cinema complex. The Club House contains tennis courts, football court, swimming pool and mixed use spaces ACC scope is developing the working architectural drawings and structural works design in addition to providing technical support during various construction phases.

Project Duration and Status : 2018 – In Progress

El Safa Plaza

*In cooperation/association and name of Advanced Construction Center ACC Riyadh, Saudi Arabia

 

Client: HB Brands, Riyadh , KSA

Location: Dammam, KSA

Project Description and ACC Scope of Work:
Al Safa Plaza is a commercial strip mall in central Dammam area . Al Safa plaza will include several famous clothing brands and a diversified food court. The mall is designed imitating the American strip malls and plazas style. ACC scope of work is to review and value engineer all designs , manage the construction and supervise all construction activities.

Project Duration and Status : 2018 – 2019 Completed

Sky Event

 

Client: Super Crème Global, Kenya

Location: Nairobi, Kenya

Project Description and ACC Scope of Work:
Sky Events international Company plan is to introduce unique designed restaurants and ancillary hospitality facilities, to be located in the Nairobi National Park. The project shall explore the re-purposing of 40-foot shipping container(s) for hospitality functions, one of which (the Atrium) will be lifted via crane up to a height of 150 ft. above ground. ACC scope of work is the architectural and engineering design of the containers and their arrangements, including lifting techniques , transportation mechanism and packing systems.

Project Duration and Status : 2018 – 2019 Completed

Half Moon 2006 Asian Games Statue

 

Client: Qatar Olympic Committee , Doha , Qatar

Location: Aspire City , Doha, Qatar

Project Description and ACC Scope of Work:
Half Moon statue is to memorize the volunteers names of the 2006 Asian games hosted in Doha, Qatar. The Statue acts as a state-of-art symbol for the Asian games within the Aspire City development which hosted the 2006 Asian Games. ACC scope is the engineering design and supervision of the statue.

Project Duration and Status : 2006 Completed

Iconic Tower

 

Client: Chine State Construction (CSCEC) Egypt Branch

Location: New Capital , Cairo , Egypt

Project Description and ACC Scope of Work:
The Iconic tower is the main landmark of Egypt’s new capital project. The tower will be the tallest in Egypt and Africa. It is part of the Capital Business District project (CBD). The tower has multi purposes functions including hotels and commercial areas. ACC is assigned by CSCEC the project main contractor the task of BIM modeling of mechanical and electrical floors in addition to producing coordinated shop drawings out of the BIM Model.

Project Duration and Status : 2020 Completed

Jeddah Yacht Club

 

Client: Modern Building Leaders , MBL Contracting , KSA

Location: Jeddah, KSA

Description and Scope of Work: Jeddah Yacht club is part of the formula one project which is hosted by Saudi Arabia on 2021. It is an iconic building resembling a sailing boat when overlooked from the sea. The Yacht club is composed of three main buildings namely yacht club overlooking the red sea with its yachting docks, an infinity swimming pool and a beach club. Jeddah Yacht club is considered the first of its kind in Saudi Arabia. ACC scope of work is the full structural design of all the project buildings in addition to the steel structure design of the iconic mast and statue.

Project Duration and Status : 2021 – In Progress

National Bank Of Egypt , NBE.

 

Client: National Bank Of Egypt

Location: Various Locations, Egypt

Project Description and ACC Scope of Work:
The National Bank of Egypt is the largest bank in Egypt and one of the largest banks in Africa and the Middle East. ACC is the main consultant for bank’s branches engineering design and supervision works. ACC has been assigned more than 20 branches around Egypt and has successful completed 8 branches.

Project Duration and Status : 2017 – In Progress

National Bank of Kuwait

 

Client: National Bank of Kuwait, Egypt

Location: Various Locations, Egypt

Project Description and ACC Scope of Work:
The National Bank of Kuwait is the largest banks in the State of Kuwait. The bank has significant operations in Egypt with a considerable number of branches. ACC is the main consultant for the bank engineering and supervision works. ACC has been assigned for all engineering design works and supervision for the NBK branches renovation of Zamalek and Dokki.

Project Duration and Status : 2021 – In Progress

QNB Islamic Bank Office Building

 

Client: H.E. Shk. Ali Bin Ahmed Al-Thani, Doha , Qatar

Location: Doha , Qatar

Project Description and ACC Scope of Work:
This QNB Branch is one of the main branches for Qatar National Bank in the heart of Doha City. Qatar National Bank is considered the largest bank in Qatar and one of the main pillars of the Qatari banking industry. ACC scope of work included providing technical support to the main contractor (Gettco) during all construction phases

Project Duration and Status : 2004 – 2006 Completed

Jebal Omar Development Hotels, Phase 2

 

Client: Saudi Arabian Baytur Contracting Company, SAB , KSA

Location: Makkah, KSA

Project Description and ACC Scope of Work: Jebal Omar (Phases 2) is one of the major developments serving the Holy Haram area in Makkah. The project contains a number of towers with a central connecting podium. Phase 2 contains a 1200 rooms Hotel that will be operated by Jumira Hotels. ACC has a full onsite technical support team. ACC scope includes design support, shop drawings, project control, contracts and claims management, Quality assurance and control, health and safety management, quantity surveying and site inspection works.

Project Duration and Status : 2013 – On going

Commercial International Bank, CIB

 

Client: Commercial International Bank, CIB, Egypt

Location: Various Locations, Egypt

Project Description and ACC Scope of Work:
CIB is considered one of the top players in the financial market in Egypt with great retail and corporate exposure. ACC is assigned as CIB’s consultant for the bank’s branches engineering design and supervision works. ACC has been assigned for the bank branch in Nasr City. This bank facility contains all modernized banking equipment and tools.

Project Duration and Status : 2018 – 2019 Completed

New Giza Club

Client: New Giza Club

Location: Cairo Egypt

Description and Scope of Work: New Giza Sports Club is part of the new giza development, New Giza Sports Club NGSC02 buildings includes nursery building,sports Hall,Gym, Sports Club Main Building,Community Centre Building ,NG Admin Building, supermarket & FM Building,landscaping areas and Olympic pool. The Total Plot are is around 47,426 m² with a total built up area of around 23,100 m2

Current Status: In Progress

Marriot Cairo Hotel Project

Client: Marriot Cairo Hotel Project

Location: Marriot Cairo

Description and Scope of Work: Marriot is one of the famous hotel chains which offers its guests a luxurious hospitality experience. Marriot Cairo Hotel is overlooking the Nile River and it contains various types of hotel rooms, restaurants, meeting halls , casino and amenities. The hotel was an old historical palace and is highly recognized for its classical style.

Current Status: In Progress